Description
Maximum productivity - up to 200 m 3 of non-autoclaved aerated concrete blocks and 100 t dry mix per day
Finished products - blocks wall and partitions with a mark on average density Д500-Д700 with compressive strength В1-В3,5 (GOST 21520-89).
Dry mixture of two components.
The volume of the array is 1 m 3.
The time of filling one array is about 7 minutes.
The time to hold the massif before cutting is 3 to 4 hours.
The time of holding the cut mass before packing is 19-20 hours.
Warehouse stock of cement - 120 tons.
Warehouse stock filler - 120 tons.
The installed capacity of the equipment is 360 kW
Consumption of water - 50 tons of water per day.
Operating personnel - 8 people (without a warehouse).
Accommodation conditions - in a shop type room in the absence of precipitation and at least + 50C.
The area of the workshop is not less than 2000m2.
The height in the filling zone is 7,5 m.
The height of the rest of the room is not less than 3.5 m.
Similar products
Self-propelled molding machine MFS-2 with a set of accessories for the production of FBS blocks of all standard sizes
- Vendor code
- 1261
Price 67,234.72 USD
Semi-automatic plant VUM-8 for the manufacture of slatted floors for livestock buildings
- Vendor code
- 1258
Price 110,333.9 USD


















